Poltava, UkraineField support at the well
Pilot Drilling Technologies
PL-MCT

Cementing sleeve

Cementing sleeve is designed for running casing, "liners", in one section with their subsequent collar cementing, as well as for cementing casing of lower or upper section in two stages. More often used when running down and cementing "liners" with filtering part. PL-MCT cementing sleeves are used together with other process equipment based on technological conditions of the well.

Casing string
4 1/2" (127) – 9 5/8" (244,5)
Sizes
7
Equipment line
Technological equipment for sectional and stepped well casing

Equipment set includes

  • step cementing coupling;
  • stop clutch;
  • bottom separating plug;
  • top separating plug.

Design advantages

  • running and cementing wells in difficult geological and technological conditions;
  • availability of redundant option of flushing holes opening;
  • locking of closing sleeve;
  • adjustment of flushing orifices opening pressure;
  • wide range of working pressure;
  • anti-rotation performance of plugs and their fixation;
  • elements of PL-MCT couplings are destroyed by PDC type chisel;
  • reliability and ease of use.

Sizes and specifications

7 sizes, 5 parameters

SizeOuter diameter max.mmInner diameter min.mmMaximum pressure — ActivationMPaMaximum pressure — TestingMPaLoad capacityt
4 1/2" (127)needs checking against print1509830100150
5" (127)15010830100150
5 1/2" (139,7)19512130100180
5 3/4" (146)19512730100190
6 5/8" (168,3)21315130100200
7" (178)21315930100200
9 5/8" (244,5)3052252590250

Non-standard sizes are made to order — send the well parameters.

Documents

Datasheetin preparationCertificate of conformityin preparationOperating manualin preparation

Related equipment

PL-CB/CTTechnological equipment for sectional well casingPL-HSTHydraulic stage cementing toolAll products in this line

Request · PL-MCT

We reply within one business day.