
PL-CB/CT
Technological equipment for sectional well casing
Technological equipment for sectional well casing is designed for running and casing of oil and gas wells in especially difficult geological conditions. It has the ability to run and fasten two or more sections of casing, and the connection of the sections is made in an open and cased wellbore.
- Casing string
- 5 1/2" (139,7) – 13 3/8" (339,7)
- Sizes
- 7
Design advantages
- running and cementing of deviated and horizontal wells;
- cementing of sections in strained state;
- availability of several schemes of flushing holes opening during cementing of the first section;
- design options allowing for rotation of the section during lowering;
- reliable packer sealing of the junction;
- availability of a check valve;
- protective casing for connection of sections;
- possibility of emergency disconnection of the upper section from the lower one by turning to the right;
- elements of technological equipment are destroyed by PDC type chisel;
- use under significant pressure and temperature fluctuations.
Sizes and specifications
7 sizes, 5 parameters
| Size | Outer diameter max.mm | Inner diameter min.mm | Maximum pressure — CementingMPa | Maximum pressure — TestingMPa | Load capacityt |
|---|---|---|---|---|---|
| 5 1/2" (139,7) | 195 | 121 | 30 | 100 | 180 |
| 5 3/4" (146) | 195 | 127 | 30 | 100 | 190 |
| 6 5/8" (168,3) | 213 | 151 | 30 | 100 | 200 |
| 7" (178) | 213 | 159 | 30 | 100 | 200 |
| 9 5/8" (244,5) | 305 | 225 | 25 | 90 | 250 |
| 12 3/4" (323,9) | 377 | 302 | 20 | 50 | 300 |
| 13 3/8" (339,7) | 392 | 321 | 20 | 45 | 300 |
Non-standard sizes are made to order — send the well parameters.
Documents
Datasheetin preparationCertificate of conformityin preparationOperating manualin preparationRelated equipment
PL-HSTHydraulic stage cementing toolPL-MCTCementing sleeveAll products in this lineRequest · PL-CB/CT
We reply within one business day.