Poltava, UkraineField support at the well
Pilot Drilling Technologies
PL-POP

Pump-out Plug

The pump-out plug is installed in the lower part of the pipe string and is designed to isolate the pipe space from the annulus and activate the hydraulic equipment installed above the device by creating an overpressure. To deactivate the pump-out plug, a pressure value is created in the tubular space, providing a full-bore opening the inner .

Sizes
5
Equipment line
Downhole equipment

Design advantages

  • Possibility to adjust the pressure values for activation and deactivation in the field.
  • Simplicity and reliability of design.
  • High strength characteristics.

Sizes and specifications

5 sizes, 4 parameters

SizeTubing ODmmOuter diameter max.mmInner diametermmThread connection
2 3/8"needs checking against print60,3257750,82-3/8" EUE
2 7/8"73,02593,263,52-7/8" EUE
3 1/2"88,9114,376,23-1/2" EUE
4 1/2"114,3141,2101,6At the request of the Customer
5 1/2"139,7152,4130,3At the request of the Customer

Non-standard sizes are made to order — send the well parameters.

Documents

Datasheetin preparationCertificate of conformityin preparationOperating manualin preparation

Related equipment

PL1-XPackerPL-CPackerPT-2Model "PT-2" On-Off ToolThe Latch Seal the permanent packer (Permapack)PL-XASliding Sleeve (SSD)All products in this line

Request · PL-POP

We reply within one business day.