Poltava, UkraineField support at the well
Pilot Drilling Technologies
PL-CHB

Cementing head

Cementing head are designed for the duty of oil and gas well for the purpose of:

Casing string
5 1/2"-5 3/4" (139,7-146,05) – 12 3/4"-13 3/8" (323,8-339,7)
Sizes
4
Equipment line
Auxiliary equipment

are designed for the duty of oil and gas well for the purpose of:

  • quick-connect and hermetic connection of casing string with high-pressure line of cementing units or drilling pumps;
  • preliminary fixation and release cement displacement plug and wiper sectional cementing plugs and control elements ( plugs "BOMB");
  • control of the flow of buffer fluid, drilling and tamponage mud in relation to the displacement plug and wiper sectional cementing plugs .

Design advantages

  • plug start control;
  • fast and unhindered release of plugs;
  • equalization of hydrostatic pressure under and above the plugs;
  • quick-connect thread with cementing head and casing.

Sizes and specifications

4 sizes, 4 parameters

SizeOuter diameter max.mmInner diameter min.mmDistance between the support pinsmmWorking pressureMPa
5 1/2"-5 3/4" (139,7-146,05)16812840050
6 5/8"-7" (168,3-177,8)20016042050
9 5/8" (244,5)27424545040
12 3/4"-13 3/8" (323,8-339,7)needs checking against print38034050020

Non-standard sizes are made to order — send the well parameters.

Documents

Datasheetin preparationCertificate of conformityin preparationOperating manualin preparation

Related equipment

PL-StStingerPL-CHCementing headPL-SVFloat valvePL-SShoePL-FSFloat shoeAll products in this line

Request · PL-CHB

We reply within one business day.